The diagnostic process starts with a spirit level check across the whole patio to map low spots and measure the existing fall. A correctly set patio should fall away from the house at a minimum ratio of 1:80. Where the fall runs back toward the building, or where there is no consistent fall at all, the sub-base needs to be re-graded rather than the surface patched.
Clay-heavy ground across Huntingdon and the wider Cambridgeshire area can cause sub-base settlement over time, particularly after a wet winter. Where settlement is localised, a partial relay, lifting the affected slabs, rebuilding the sub-base, resetting the mortar bed, and relaying, is sufficient. Where the fall is wrong across the whole area, a full base rebuild is the only lasting fix.
Drainage channels can be incorporated at the patio edge or across the surface where a soakaway or surface water route is needed. Damp-proof course clearance is checked at the house wall before any new level is set. The quote covers base inspection, sub-base work, mortar bed re-laying, jointing compound, and any drainage channel installation as separate line items.